Reserve interest
Illustrative aerial view of Dunottar City green spine, neighbourhoods and streets

Dunottar City · Manyame R.D.C. · Zimbabwe

Build new urban capacity for Zimbabwe.

Dunottar brings the current July 2025 plan into one evidence-aware city story: a new, infrastructure-led urban growth proposition that can be inspected, tested and developed in stages.

Current plan evidence · Strategic project brief · Illustrative future city
612.32 haSource-plan area9,905Planned stands + sites
One project. One current plan authority.The July 2025 Dunottar Farm / Manyame R.D.C. plan controls the spatial figures used across this website.
612.32hectarescurrent plan ledger
9,905stands + sitesplan-stated
9,580residential standsplan-stated
43.63 haopen spaceplan-stated

01 · The national proposition

Regenerate existing cities. Build new capacity at the same time.

The project case is complementary: urban renewal remains necessary, while planned new-city development can add capacity, modern infrastructure and new economic functions without requiring every future need to be retrofitted into existing urban fabric.

Dunottar is the project-level response: a current 612.32-hectare plan that can be used to test a new urban-development model in real spatial terms rather than as an abstract smart-city idea.

01

MASTER PLANNED

Land use, movement, housing, enterprise, civic functions and landscape are coordinated as one city system.

02

INFRASTRUCTURE FIRST

Utilities, access, water, waste, transport and digital systems are treated as enabling programmes, not afterthoughts.

03

SMART-CITY ENABLED

Digital infrastructure and city operations are designed into the delivery brief from the outset.

04

INVESTMENT LED

Economic uses, delivery packages and partner roles are defined alongside housing and public infrastructure.

05

SUSTAINABLE

Open space, water resilience, energy efficiency and long-term operations form part of the city brief.

02 · Spatial products

One city model. Different jobs.

Dunottar is being built as more than a 3D presentation. The same plan can support public engagement, demand capture, investment conversations, delivery coordination, evidence review and future city operations without fragmenting the project into disconnected tools.

03 · Current plan authority

Replace indicative numbers with the current plan.

The project presentation previously used an indicative “up to 500 hectares” figure. The July 2025 amended Dunottar layout is newer and more specific, so the website now uses 612.32 hectares as the current plan area.

The same rule applies throughout the project: where a strategic presentation and the current plan differ on plan-stated quantities, the current plan controls.

612.32hectarescurrent plan ledger
9,905stands + sitesplan-stated
9,580residential standsplan-stated
58flat sitesplan-stated
82commercial sitesplan-stated
81industrial sitesplan-stated
47institutional sitesplan-stated
43.63ha open spaceplan-stated
Earlier strategic presentationUp to 500 hectares
Current plan authority612.32 hectares

04 · One integrated city system

Live. Work. Learn. Heal. Play.

The project is not presented as a housing estate with supporting amenities added afterwards. The current plan is read as a mixed urban system in which residential capacity, economic uses, civic land, schools, movement and open space have to work together.

LIVE

9,580 residential stands + 58 flat sites

Housing at multiple densities, connected to daily services and public realm.

PLAN-DERIVED PROGRAMME
WORK

82 commercial + 81 industrial sites

A productive city requires enterprise, services, employment and investment alongside homes.

PLAN-DERIVED PROGRAMME
LEARN

12 school sites

Nine primary and three secondary school sites are carried in the current plan.

PLAN-DERIVED PROGRAMME
HEAL

47 institutional sites

Institutional land provides capacity for civic and social services; the exact health programme requires confirmation.

PLAN + PROGRAMME TO CONFIRM
PLAY

43.63 ha open space

Green corridors, recreation, shade and public space are treated as city infrastructure.

PLAN-DERIVED PROGRAMME

05 · Diaspora participation

Mobilise more than remittances.

The Diaspora City proposition is designed around a wider contribution model: capital, professional capability, technology, international networks and entrepreneurship can all be structured into defined delivery and operating roles.

The website does not treat diaspora interest as funding already secured. The next step is to build transparent, professionally governed routes through which participation can be evaluated and contracted.

CAPITAL

Long-term savings and investment capacity.

SKILLS

Professional, technical and delivery expertise.

TECHNOLOGY

Digital systems, knowledge transfer and modern operating models.

NETWORKS

International business and institutional relationships.

ENTREPRENEURSHIP

Business formation, partnerships and productive city uses.

06 · Infrastructure for the city we intend to build

Design for long-term operation, not retrofit.

Fibre, energy, water, mobility, digital governance and safety are project requirements to be tested through feasibility and detailed engineering. They are not presented here as installed infrastructure.

Design requirement

Fibre connectivity

Plan the digital backbone with the physical city rather than retrofit it later.

Design requirement

Renewable energy

Evaluate distributed and resilient energy solutions as part of detailed engineering.

Design requirement

Smart water systems

Connect water security, storage, metering, reuse and long-term operations.

Design requirement

Integrated transport

Coordinate roads, public transport, walking and movement hierarchy across the city.

Operating requirement

Digital governance

Create accountable records for land, approvals, assets, evidence and city operations.

Operating requirement

Smart security

Define safety systems with governance, privacy and operational responsibility from the outset.

07 · Resilient, green, resource-efficient

Environmental performance has to be designed into the city.

The strategic presentation identifies solar power, water harvesting, wetland protection, green corridors and urban forestry as part of the sustainable urban model. On this website they are treated as environmental design requirements to be tested through feasibility, environmental evidence and detailed engineering — not as systems already delivered.

Solar power

Evaluate renewable energy and distributed generation as part of the detailed city energy strategy.

Design principle
Water harvesting

Plan capture, storage, reuse and water-efficiency measures through feasibility and detailed engineering.

Design principle
Wetland protection

Identify and protect wetlands and other sensitive natural systems where authoritative environmental studies confirm them.

Environmental requirement
Green corridors

Connect open space, movement, shade, habitat and neighbourhoods as a city-scale green network.

Design principle
Urban forestry

Use long-term shade, biodiversity and streetscape planting as part of the public-realm and resilience strategy.

Design principle

08 · Strategic national outcomes

A growth pole has to create productive national value.

The Ministry presentation sets out seven intended national outcomes. Dunottar now carries all seven explicitly, while keeping them as outcomes to be demonstrated through feasibility and implementation rather than promises already achieved.

Reduce pressure on existing cities

Add planned urban capacity as a complement to renewal and infrastructure upgrades in existing cities.

Create a new economic growth pole

Combine housing, enterprise, infrastructure and civic functions in a productive mixed-use city programme.

Support housing delivery

Advance the current residential and flat-site programme within a wider human-settlements system.

Increase foreign investment

Create credible routes for diaspora, institutional and international participation subject to governance and due diligence.

Promote innovation

Use smart infrastructure, digital governance and new operating models as design and delivery requirements.

Generate employment

Enable future construction, technology, services, manufacturing and city-operating roles through implementation.

Showcase Zimbabwe internationally

Demonstrate a plan-led, evidence-aware approach to contemporary Zimbabwean urban development if the programme is successfully delivered.

09 · Government + delivery pathway

Move from proposition to an accountable implementation route.

The immediate ask is not to treat the digital city as an approval or an investment offer. It is to use the current plan and evidence base to structure technical engagement, resolve the outstanding statutory and delivery questions, and define a feasible route into detailed masterplanning and implementation.

01

Technical engagement

Align the project team, relevant authorities and technical stakeholders around the current plan, evidence position and decision requirements.

02

Reconcile land, planning and feasibility

Confirm title/authority, statutory planning position, exact parcel geometry, environmental constraints, demand and infrastructure assumptions.

03

Detailed masterplanning + engineering

Advance the current layout into coordinated infrastructure, mobility, utilities, public realm, phasing and costed delivery packages.

04

Governance + investment structure

Define accountable decision rights, procurement, reporting, partner roles, funding routes and evidence controls.

05

Phased implementation

Deliver in sequenced packages with dated evidence, measurable milestones and a spatial record that remains current.

10 · Spatial demonstrator

Move from national proposition to one place on the plan.

The interactive model keeps the strategic story attached to geography. Move from the whole city to districts, streets and plan-anchored properties without pretending illustrative architecture is built reality.

11 · Evidence hierarchy

Strategy can evolve. The evidence chain must stay visible.

The Ministry presentation and the current plan are part of the same project, but they perform different jobs. The plan controls spatial quantities. The strategic brief explains why the project matters and what it is intended to become. Feasibility, approvals, engineering, governance and commercial terms still require their own dated evidence.

CURRENT PLAN AUTHORITY

Proposed amendment of a high density residential layout on Dunottar Farm, Manyame R.D.C.

July 2025 · Scale 1:5000 · Controls plan-stated quantities and spatial relationships used by this website.

STRATEGIC PROJECT BRIEF

Strategic city-development brief — project reference presentation

Defines the national-development rationale, intended city systems and proposed institutional pathway. Where an indicative figure conflicts with the July 2025 plan, the plan controls.

OPEN EVIDENCE

Items still requiring authoritative confirmation

Title and land authority, approvals, exact parcel geometry, environmental position, infrastructure capacity and servicing, phasing, costs, funding structure, procurement, commercial terms and implementation status.

Review the evidence register ↗
Evidence boundaryThe digital city is an evidence-aware planning and engagement tool. Architecture, landscape, smart-city systems and future operations remain proposals or illustrative concepts unless a stronger dated source says otherwise.
Plan-derived Dunottar masterplan detail

Dunottar City · Zimbabwe

From strategic proposition to a city that can be inspected.

Start with the current plan. Test the city system. Resolve the evidence gaps. Then move into detailed feasibility, engineering, governance and phased delivery.