Illustrative Dunottar remote build control-room design study

Infrastructure + delivery · Government engagement

Turn the current plan into an implementation pathway.

Dunottar already has a current July 2025 plan. The next challenge is not to repeat the vision—it is to reconcile the statutory and land position, complete feasibility, coordinate infrastructure, establish governance and convert the city into phased, accountable delivery packages.

Current plan · Proposed institutional pathway · Delivery evidence required
612.32 haSource-plan area9,905Planned stands + sites

01 · Delivery starting point

Use the current plan as the common technical surface.

The July 2025 amended Dunottar layout provides a 612.32-hectare spatial programme, but a plan is not the same as a fully reconciled implementation package. Exact parcel topology, statutory status, engineering capacity, environmental requirements, phasing, costs and delivery responsibilities must be resolved through the next technical stages.

612.32hectarescurrent plan ledger
134.33ha roadsplan-stated
60mrailway servitudeplan-labelled
330kVexisting powerlineplan-labelled constraint

02 · Smart infrastructure brief

Infrastructure-first means design requirements before marketing claims.

Fibre, renewable energy, smart water, integrated transport, digital governance and safety systems are part of the strategic city brief. Each requires feasibility, standards, ownership, cost and operating decisions before it becomes a verified delivery claim.

Design requirement

Fibre connectivity

Plan the digital backbone with the physical city rather than retrofit it later.

Design requirement

Renewable energy

Evaluate distributed and resilient energy solutions as part of detailed engineering.

Design requirement

Smart water systems

Connect water security, storage, metering, reuse and long-term operations.

Design requirement

Integrated transport

Coordinate roads, public transport, walking and movement hierarchy across the city.

Operating requirement

Digital governance

Create accountable records for land, approvals, assets, evidence and city operations.

Operating requirement

Smart security

Define safety systems with governance, privacy and operational responsibility from the outset.

03 · Proposed institutional engagement

Move from presentation to a shared technical programme.

The Ministry presentation asks for strategic recognition, a land pathway, a multi-stakeholder technical committee, feasibility/masterplanning support and policy integration. The website carries all five forward, with one necessary reconciliation: because the current Dunottar plan already identifies the project site and programme, the generic land-allocation request becomes confirmation of the existing land authority, tenure/title and statutory pathway.

01

Strategic recognition

Seek formal consideration of Dunottar / Diaspora City as a strategic project so the relevant national and local-government workstreams can be coordinated.

02

Confirm the land + statutory pathway

Replace the earlier generic land-allocation ask with authoritative confirmation of the existing Dunottar land position, tenure/title authority, planning status and the statutory route into implementation.

03

Multi-stakeholder technical working group

Bring the relevant Ministry, Manyame R.D.C., statutory, planning, engineering, housing, environment, investment and project stakeholders into one technical programme.

04

Feasibility + masterplanning support

Advance coordinated feasibility, detailed masterplanning, infrastructure engineering, environmental work, phasing and costed delivery packages.

05

Policy integration

Test how the project should interface with national urban-development, human-settlements and investment policy rather than claiming policy status in advance.

Plan-derived Dunottar masterplan atlas view
Current plan spatial surface · plan-derived

04 · Spatial delivery model

Keep every decision attached to the place it affects.

The same city model used for public engagement and reservation interest can become a coordination surface for design packages, infrastructure interfaces, phasing, decisions, evidence and later operations. The value is continuity: city → district → street → property → system, without losing the source plan underneath.

05 · Decision discipline

Separate what is planned, what is proposed and what is delivered.

The government-facing product has to be useful precisely because it does not flatten those stages together. A proposed smart-city system, a plan-labelled infrastructure reserve and a physically installed asset are different states and should remain visibly different in the spatial record.

Evidence boundaryNothing on this page states that infrastructure is funded, procured, installed or operational. It sets out the delivery programme and evidence gates required to move from the current plan into feasibility, detailed design, approvals and phased implementation.